- Business Fields
- Mobility • Energy
- Rail & track
- Sicheres Autonomes Fahren
- Testing and qualifying hydrogen technologies
- Construction of burst chambers
- Testing under pressure: hydrogen in operation
- Nuclear technology
- Safeguarding of artificial intelligence (AI)
- Engineering and Support of wind energy plants
- Testing & qualification of wind energy plants
- Mobility services
- Nuclear technology
-
Qualification of the emission monitoring sampling system
The requirement
- Qualification of the sampling system for the exhaust air monitoring system in KKP1 and KKP2
- Recurring test (WKP) of the total loss factor.
- Qualification of the sampling level, adaptation of the system
The results
- Identification of the relevant parameters for the sampling system
- Characterisation of the plant-specific emission
- Conformity with the regulations (KTA 1503.1)
- Metrological verification and approval of the sampling system
The solution
- Metrological verification of the "total loss factor"
- Updates to the inspection specifications
- System re-evaluation after changes to the operating parameters
- Qualification of the sampling plane
- Adaptation & certification of the emission monitoring sampling system
The added value
- "Clean & precise" procedure for metrological qualification
- Results in accordance with regulations and standards, recognised procedure
- Individual consultation on the plant-specific / on-site system
- 17.03.2023 Härtetests für moderne Materialien in Gasturbinen
- 22.02.2023 IABG qualifiziert Wasserstofftanks für Nutzfahrzeuge
- 14.10.2022 Verbundprojekt SmarTram: Auf dem Weg zur intelligenten, autonomen und sicheren Trambahn
- 24.06.2022 IABG hands over the large-scale test bench MAXI to the German Federal Armed Forces as general contractor